Skip to content
ANGEL MAILE
Let’s talk
ANGEL MAILE
Web Development

3 – 12 weeks, From R48,000

Build

Web Development

Production front-end engineering in Next.js and TypeScript, with performance and accessibility treated as requirements rather than a later phase.
Why it matters

A website is a promise about how careful your business is. Slow, jittery, inaccessible builds break that promise before anyone reads a word. Every build here ships with a performance budget and an accessibility standard written into the acceptance criteria.

Next.jsTypeScriptTailwind CSSPlaywrightVercel

At a glance

Timeline
3 – 12 weeks
Investment
From R48,000
Engagement
Fixed scope or monthly retainer
Discipline
Build

Deliverables

Exactly what lands in your hands.

Written into the contract, so there is never a debate at the end about what was in scope.

  • 01A production Next.js application in TypeScript
  • 02Responsive implementation from 320px upward
  • 03WCAG 2.2 AA accessibility pass with a written report
  • 04Core Web Vitals budget enforced in CI
  • 05CMS integration with editor documentation
  • 06Deployment pipeline, preview environments and rollback
Process

Four phases, in this order, every time.

The sequence does not change. What changes is how long each phase runs and how much of it your team already has covered.

  1. 01

    Set the budget

    Performance and accessibility targets agreed up front and wired into the pipeline, so regressions fail the build rather than the launch.

  2. 02

    Build the system

    Components before pages. Every page is assembled from a library that is already tested, typed and documented.

  3. 03

    Wire the content

    Structured content modelled so editors can publish confidently without a developer on standby.

  4. 04

    Ship and watch

    Staged rollout, real-user monitoring for the first fortnight, and a fix window included in the engagement.

Development environment and CI
Development environment and CI
Building in Cape Town
Building in Cape Town
Shipped, measured, iterated
Shipped, measured, iterated
Best for
  • Marketing sites that need to be genuinely fast, not just score well once
  • Design-led teams needing a faithful, resilient implementation
  • Products migrating off a page builder they have outgrown

Not sure this is the one you need? Describe the problem instead of the solution and I will point you at the right shape, even when that is a different service.

Questions

About web development.

That is the point. Conventional patterns, typed interfaces, a written README and a handover session recorded for whoever joins later.

Often. I start with a written audit (architecture, dependencies, performance, accessibility and risk) before committing to a rebuild or a rescue.

Related work

Where this service produced something real.


ContactBooking from next quarter

Ready to talk about web development?

3 – 12 weeks typically, from r48,000. Send me the details and you will have a scoped proposal (phases, hours and assumptions shown) within a few days.

Studio
Studio 04, Bree Street, Cape Town
Hours
Mon – Fri, 08:30 – 17:30 · SAST (UTC+2)
Angel Maile at work

Replies within one business day. Cape Town, South Africa, SAST (UTC+2).

Cape Town